PID Tuning for Gas Processing facility Al-Khafji Joint Operations in KSA
Shortly after the KJO gas plant was revamped in 2014, IPCOS was asked to conduct an audit and optimize the base control layer to improve production uptime and processing stability.
In total 178 loops of the KJO gas processing facility were reviewed and where needed optimized with AptiTune.
Learn in this case study:
- How AptiTune can optimize gas plants
- The workflow used by AptiTune to compute the proper PID settings
- The improved tuning of the LTS, Deethanizer and the condensate stabilizer had a major improvement on the overall stabilization of the KJO gas processing facility.